PROJECTS
PREVIOUSLY COMPLETED
Project: Mt Ida
Location: Goldfields, WA
Material: Various sizes 316L Stainless Steel and Carbon Steel Piping
Project Size: 10 Metric Ton S/S and 15 Metric Ton C/S
Year: 2022/2023
Scope of work: Supply of materials, shop fabrication of stainless steel pipe packages including oxygen lines, chemically cleaned carbon steel piping for lube lines and various carbon steel pipe packages.
Project: Lake Way
Location: Northern Goldfields, WA
Material: 15NB – 450NB Carbon Steel Pipe and 15NB - 500NB Stainless Steel Pipe
Project Size: 30 Metric Ton S/S and 30 Metric Ton C/S
Year: 2020/2021
Scope of work: Supply of materials and consumables, shop fabrication of stainless steel, carbon steel and ceramic lined carbon steel pipe spooling. NDT Testing, surface preparation, ceramic lining, painting, pickling of stainless steel and packing goods for transport.
Project: Paste Backfill Facility
Location: Ghana, West Africa
Material: 15NB – 200NB Carbon Steel Pipe and 15NB - 80NB Stainless Steel Pipe
Project Size: 0.5 Metric Ton S/S and 16 Metric Ton C/S
Year: 2020
Scope of work: Supply of materials and consumables, shop fabrication of stainless steel and carbon steel pipe spooling. Testing, surface preparation, rubber lining, painting, pickling of stainless steel and packing goods for transport.
Project: MARPOL Segregated LFSO Systems
Location: Kwinana WA
Material: 40NB - 600NB Carbon Steel Pipe
Project Size: 80 Metric Ton
Year: 2019 - 2020
Scope of work: Supply of materials, consumables and transportation to complete shop fabrication, NDT, pressure testing, painting, galvanising, packing and delivery of pipe spools and pipe supports.
Project: Carrapateena
Location: Port Augusta SA
Material: 15NB - 300NB Stainless Steel Pipe
Project Size: 6 Metric Ton
Year: 2019
Scope of work: Supply of materials and consumables, shop fabrication of stainless steel pipe spooling. NDT testing, Pickling & passivation of stainless steel pipe spooling and packing goods for transport.
Project: Fosterville
Location: Bendigo VIC
Material: 65NB - 350NB Carbon Pipe and 50 - 150NB Stainless Steel Pipe
Project Size: 7 Metric Ton C/S & 0.3 Metric Ton S/S
Year: 2019
Scope of work: Supply of materials and consumables, shop fabrication of carbon steel and stainless steel spooling. Testing, surface preparation, painting, pickling of stainless steel and packing goods for transport.
Project: Carosue Dam
Location: Kalgoorlie WA
Material: Carbon and Stainless Steel
Project Size: 1.5 Ton C/S & 0.2 Ton S/S
Year: 2018
Scope of work: Supply of materials and consumables, shop fabrication of carbon steel rubber lined pipe spooling. Testing, surface preparation, painting and packing goods for transport.
Project: Sole Gas Development Project - Orbost Gas Plant Upgrade
Location: Orbost VIC
Material: Carbon and Stainless Steel
Project Size: 4.5 Metric Ton
Year: 2017/2018
Scope of work: Fabricated carbon steel base, roof and supports. Shop fabricated stainless steel pipe spooling and tank. NDT, painting and passivation of stainless steel spooling and tank. Full assembly of skid and test run of complete unit.
Project: Dalgaranga
Location: Murchison WA
Material: Carbon Steel 150NB-50NB Pipe and Stainless Steel 150NB-15NB Pipe
Project Size: 3 Metric Ton CS & 2 Metric Ton SS
Year: 2017/2018
Scope of work: Supply of materials and consumables, shop fabrication of carbon steel and stainless steel pipe spooling. Testing, surface preparation, painting and galvanising. Pickling and passivation of stainless steel pipe spooling and packing goods for transport.
Project: Alky Water Mitigation
Location: Kwinana WA
Material: Carbon Steel 600NB Pipe
Project Size: 100 Metric Ton
Year: 2015
Scope of work: Supply of consumables and transportation to complete shop fabrication, NDT, pressure testing, painting, galvanising, packing and delivery of pipe spools and pipe supports.
Project: Fire Water Main Pump Piping Fabrication
Location: Kwinana WA
Material: Carbon Steel 150NB and 300NB Pipe
Project Size: 30 Metric Ton
Year: 2015
Scope of work: Supply of materials, consumables and transportation to complete shop fabrication, NDT, pressure testing, painting, galvanising, packing and delivery of pipe spools and pipe supports.
Project: Tank Fire Risk Mitigation
Location: Kwinana WA
Material: Carbon Steel 150NB Pipe
Project Size: 80 Metric Ton
Year: 2014
Scope of work: Supply of materials, consumables and transportation to complete shop fabrication, NDT, pressure testing, painting, galvanising, packing and delivery of pipe spools and pipe supports.